Peel Ports sees increased throughput

Peel Ports is celebrating a record-breaking month for its container operations at the Port of Liverpool. Quayside and landside throughput in October at its Liverpool container terminals exceeded all previous figures on record, with year on year growth of 12%.

The cargoes were connected with a total of 16 shipping lines.

Peel Ports, the UK’s second largest port operator, has also managed to reduce the length of time trucks are spending at the port. The average truck turnaround time at the Port of Liverpool is now consistently below 40 minutes, a UK leading service standard. 

Peel Ports recently entered into an agreement with global terminal business, Terminal Investment Limited Sarl (TiL). The proposed joint venture involves the development of the Liverpool2 container terminal and will enable Peel Ports to accelerate its ambitious growth plans. 

Work has already commenced on the second phase of the Liverpool2 project development to provide additional capacity for the expected increase in volumes.

The next phase of development at the Liverpool2 deep-water container terminal will see the arrival of STS cranes before the end of the year, with the overall project expected to be completed during 2021.

The multi-million pound project will significantly increase the footprint of the site and see the addition of ten cantilever rail mounted gantry cranes (CRMGs) and three ship-to-shore cranes (STS).

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters