Infrastructure investment supports huge cranes

Posted on Tuesday 27 July 2021

DP WORLD has completed a crane rail extension at its Southampton terminal, which will allow the world’s largest cranes to service the full length of the quay.

Part of DP World’s £40m investment this year in Britain’s second largest container terminal, the 120m crane rail extension has foundations reaching 26 metres below the ground and took 16 weeks to build. It will facilitate the movement along the quay of some of the terminal’s 12 Liebherr cranes which stand up to 130m high, with flexibility being the highest priority for the equipment. 

The new configuration is designed to maximise utilisation and will save customers’ time by speeding up quayside loading and unloading. Together with the granting of permission for a third berth to be dredged down to a depth of more than 15 metres, and the addition of a second empty containers park scheduled for September (£3m investment) will take Southampton up to the next level as a smart logistics hub.

In March London Gateway and Southampton became the first deep-water ports in Britain capable of handling Freightliner’s new 775 metre intermodal container trains.

For more information, visit www.dpworld.com

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters