Hörmann features as Crewe built-to-suit warehouse comes on line

Posted on Wednesday 19 January 2022

PANATTONI HAS developed Crewe 305 for the market. The warehouse will provide 305,000 sq ft of built to suit logistics space.

The movie follows the completion and occupation of Crewe 240 at the same site by Panattoni.

Crewe 305 is situated next to the West Coast Mainline and 5 minutes off Junction 16 of the M6. The area is expected to become a major hub for HS2.

Rated BREEAM ‘Very Good’, the logistics space includes a three-storey office, 15-metre clear internal height and 49 HGV parking spaces. Hörmann UK supplied full loading bays with safety and operational equipment including dock buffers, dock lights and traffic lights, plus sectional level access doors and fire exit doorsets.

The 27 loading bays consist of Hörmann SPU F42 sectional doors with HTL-2 dock levellers, featuring a 1 metre telescopic lip which provides an optimal range loading platform. This enables precise bridging for a variety of vehicle types and a guarantee of fast, efficient, and most importantly safe loading and unloading.

23 ‘single bay’ and 4 DSS-G ‘double/euro bay’ dock shelters have been installed to provide protection from the elements for both operatives and goods, helping to reduce heat loss during loading and unloading operations.   

Other elements of the Hörmann UK loading system include reinforced dock bumpers, which are constructed from recycled tyre rubber with 15mm thick steel faceplates. The buffers are designed to minimise any potential damage to the bay in the event of a vehicle making direct contact with the building. Traffic lights and dock lights complete the loading bays offering the highest standards in safety and operational efficiency during the docking and loading processes.

With the Panattoni site achieving an EPC A rating, each loading and level access bay has been fitted with a Hörmann sectional door featuring double glazed vision panels, providing excellent thermal insulation with an impressive overall U-value of between 1.1 and 1.3 Wm2.K. Stucco textured profiles deliver a durable and resilient finish to withstand the external elements, while rubber draught seals to the edges of the levellers help support the minimisation of heat loss during loading and unloading operations.

The provision of 14 D65 steel fire exit doorsets, installed through the warehouse and offices, completes an impressive range of products supplied by Hörmann UK, all chosen for their quality construction and the impressive service offered by the company.

Hörmann UK industrial division manager Phil Thorpe, says: “Panattoni Crewe 240 was a landmark logistics development for the North-West and we are now extremely proud to be part of such a significant development with the completion of Panattoni Crewe 305.

“All of our loading solutions are designed to deliver unbeatable levels of safety and functionality, together with excellent thermal properties. At Hörmann we are committed to providing Panattoni’s clients with first-class solutions and service to help streamline their business needs and processes.”

For more information, visit www.hormann.co.uk

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters