Home> | Automation | >Automated handling | >30 doors installed by Adams Foods |
ARTICLE
30 doors installed by Adams Foods
12 December 2012
Working through Clegg Food Projects, Hart Door Systems' installation at Adams Foods new facility at Leek, Staffordshire, is an excellent example of the range of doors available through this specialist engineering comp

Working through Clegg Food
Projects, Hart Door Systems'
installation at Adams Foods
new facility at Leek,
Staffordshire, is an excellent
example of the range of doors
available through this
specialist engineering
company.
Hart Door Systems (HDS) has manufactured and installed over 30 doors in the new Adams Foods production building ranging from high-speed Speedors to fire shutters, insulated shutters including two fastaction shutters and also a specifically HDS manufactured high-lift door, all designed to complement to production of powdered milk products.
Alan Richardson, contracts manager at HDS, says the food production sector requires high standards of door systems to ensure air quality is not compromised.
"Hygiene is upper most as a priority so door systems have to be effective and fastacting from the goodsin/ goods out part of the plant throughout the production process," says Richardson.
Hart offers bespoke door design including prototyping, testing and third part certification. High-profile Hart projects also include the 2012 Olympics' stadium, Heathrow's Terminal 5 and the Dubai Metro.
Hart Door Systems (HDS) has manufactured and installed over 30 doors in the new Adams Foods production building ranging from high-speed Speedors to fire shutters, insulated shutters including two fastaction shutters and also a specifically HDS manufactured high-lift door, all designed to complement to production of powdered milk products.
Alan Richardson, contracts manager at HDS, says the food production sector requires high standards of door systems to ensure air quality is not compromised.
"Hygiene is upper most as a priority so door systems have to be effective and fastacting from the goodsin/ goods out part of the plant throughout the production process," says Richardson.
Hart offers bespoke door design including prototyping, testing and third part certification. High-profile Hart projects also include the 2012 Olympics' stadium, Heathrow's Terminal 5 and the Dubai Metro.
MORE FROM THIS COMPANY
- High security shutter
- Creating a clean controlled environment
- Speedor Minis for high traffic areas
- Disciplined service approach
- Hart's airport business takes off
- Hong Kong order for Typhoon shutters
- More Speedor Minis from Hart for Arla Foods
- Hart completes TVH UK contract
- Airport business takes off for Hart
- Five Speedors for Ineos
OTHER ARTICLES IN THIS SECTION