Home>Warehouse Storage>Bespoke structures>Compliant for food industry
Home>Facilities Management>Facilities management>Compliant for food industry
Home>Industry Sector>Food & drink>Compliant for food industry
ARTICLE

Compliant for food industry

05 February 2018

A Kent-based food producer needed more on-site warehouse capacity quickly, but was conscious that it could not afford to compromise on requirements.

One of Herchenbach’s UK based warehouse experts, Stuart Rathbone, visited the site to ensure he understood the specifics of this urgent request. The new warehouse would need to store essential supplies such as packaging, plastics, cutlery and other non-food items, and be adjacent to the food preparation facilities. This would help the firm avoid any interruptions due to missing inputs or transport delays. Moreover, it needed to comply with a range of other important requirements.

As one of the customer’s project engineers emphasised: “We needed a high-quality building solution that could be installed rapidly and withstand the high coastal winds we have around here. The required building lifespan is at least 20 years, and we wanted the option to relocate the building thereafter. Another very important condition is a strict compliance with the UK’s pest control and various other regulations. As we are in the food industry - hygiene and impeccable processes are paramount to our operations.”

Analysing all the particular needs for the on-site warehouse after the meeting, the Herchenbach team worked out the optimal configuration for the pre-fabricated building. A semi-permanent structure of 20m width, 64m length and 6.4m eaves height with aluminium frames was purchased. Walls made of trapezoidal sheet metal steel and a roof of high-grade industrial PVC tarpaulin helped ensure that the building would be able to endure the strong coastal winds. Inside the building a partition was installed, serving as a weather proof loading bay so that all food and hygiene standards could be strictly maintained regardless of circumstances. Even though the weather proved challenging already during installation, the building was installed within 10 working days and without any delays.

01925 552021

 
OTHER ARTICLES IN THIS SECTION
FEATURED SUPPLIERS
TWITTER FEED