Global-MSI has completed a loading bay canopy for The Box Factory in Leamington Spa.

The client required someone to design, supply and install the canopy to cover their cardboard loading operations at their factory. Due to the requirement for the new canopy to integrate with the existing building, they required an experienced designer/installer for the task.

The brief was to ensure a fit for purpose design that complimented the existing building, while looking as if it was always meant to be there. The need for minimum disruption to the site operations and vehicle movements was a key driver for the client.

Global-MSI was able to provide the client with a full package, including principal designer and principal contractor duties, civils package and full structural design. The structure was designed and built in-house at the Global-MSI premises in Doncaster, then installed by its own erectors.

The whole operation went ahead as per the programme with minimum disruption experienced on site. The client is already in discussion with Global-MSI to extend the new canopy further in phase 2.

Global-MSI is a canopy structures manufacturer with 50 years’ experience.

global-msi.com

01302 361558​

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters