INOTEC HAS carried out a line marking project for one of the UK’s key food and drink logistics providers.

The project was undertaken in one of the company’s extremely busy warehouse and distribution centres in Salford. The nine week project comprised of the installation of over 4,500 linear metres of floor marking. This included the installation of marshalling lanes, forklift truck routes, zebra crossings, pedestrian walkways and forklift truck and walking men stencils.

The project was delivered within the required timescales and completed in July 2021 on budget. It involved the revamping of the existing line marking of 48 double marshalling lanes each with the capacity to hold 26 pallets, forklift roadways and personnel walkways.

To prevent operational downtime the project had to be completed quickly and systematically. Inotec achieved this by putting in place a detailed installation plan to ensure minimal operational disruption whilst the line marking was installed.

The marshalling lanes were revamped each day, three lanes at a time in rectangular blocks along with corresponding roadways and walkways. They returned to full operation straight after the line marking was completed in each section. This approach meant that, on any given day, only six per cent of the marshalling operation was out of commission.

For more information, visit www.inotec.co.uk

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters