One shot loader combines with forklifts
For loading and unloading containers, solely relying on forklifts can be a waste of time and resources. It takes a forklift an average of 38.4 minutes to load 6.58 tons (5,973 kg) worth of pallets into a container but it takes only 15 minutes for Joloda’s container loading system to stuff 28 tons (25,401 kg) of load into a container.
Joloda’s Manual One Shot Container Stuffing System self-loads long, heavy and wide preassembled loads up to 28 tonnes in one motion. The system requires loads to be pre-assembled on a dunnage raft, but this allows loading of goods in “one shot”.
With the combination of the two, you can use the forklift to load the cargo on the container loading system’s skate train and let the loader do the rest.
The system can also be used as a container unloading platform.